Blessed Teresa of Calcutta Education Center
Limerick Township, Montgomery County, PA
Contract with:
Comfort Pro Inc.
Craig Weisman - Vice President
(610) 926-4200

Work Performed:
Balanced air systems including heat recovery units and exhaust fans. Kitchen hoods and associated exhaust fans.

Kutztown University
Kutztown, PA

Contract with:
The Warko Group
Dan Macallum - Vice President
(610) 796-4545

Work Performed:
Calculated drive package changes for Smoke Evacuation Exhaust System. Installed new drive change and re-balance system.

Tower Health
Sixth Avenue and Spruce Street
West Reading, PA 19611
Contract with:
The Reading Hospital and Medical Center
David Wolfskill - Director of Facilites
Jennifer Bossler P.E. - Project Manager

Worked Performed:
System analysis including trouble shooting systems and writing recommendation for corrective actions. Air balancing of constant volume and VAV systems. Types of terminal units include Pneumatic or Direct Digital Controls VAV systems, Induction Units and Moduline Diffusers. Certifying of Operating rooms, Isolation rooms and fume hoods. Performed Heat load studies and wrote recommendations of required cooling to achieve required room air changes and maintain proper humidity and temperature levels of operating rooms.
Performed hydronic balancing on chilled and hot water systems.

The 650-bed facility consisting of a 22-building complex located on a 36-acre campus. Work performed also includes work at the 19 satellite locations which include Occupational Health Services (West Reading and Muhlenberg Township facilities), Exeter Medical Center, and The Reading Hospital at Spring Ridge to name a few.

LSI Technologies
Allentown, PA

Contract with:
The Warko Group
Bob Reichenbach - Service Manager
(610) 796-4545

Work Performed:
Balanced air and chilled water system serving main computer room.

Tower Health
Sixth Avenue and Spruce Street
West Reading, PA 1961
(215) 325-0695
Contract with:
Skanska USA Building, Inc.
Dennis Schmehl - MEP Coordinator and project manager

Work Performed:
Balanced sophisticated automated lab air systems and variable air volume (VAV) box re-heat coils.

Arcola Intermediate School
Renovations and Additions
Eagleville, Montgomery County, PA

Contract with:
Methacton School District / Hill International, Inc.
Jerry Velazquez (Construction Manager)
(215) 557-3240

Work Performed:
Balanced air and hydronic systems which consisted of energy recovery units, geo thermal well field and water source heat pumps, VAV's and roof top units.

Reading Health Systems 
New Post Acute Care Hospital
Wyomissing, Berks County, PA

Contract with:
Wohlsen Construction Company
Charles Ward (MEP Field Coordinator)
(717) 299-2500

Work Performed:
Balanced air systems roof top units and exhaust fans.

OPTIMUM PERFORMANCE BALANCING, LLC.

© 2020 - OPTIMUM PERFORMANCE BALANCING, LLC. All rights reserved.

aaaaaaaaaaaaiii